Nicola Valley, 1 hour 45 minutes from Kelowna
Epoxy flooring
Merritt
Apex considers projects in Merritt and the Nicola Valley for garage floors, ranch and equipment shop floors, and commercial and highway-service coatings through Collettville, Diamond Vale and Lower Nicola.
- Garage floors from
- $8/sq ft
- Neighbourhoods covered
- 7
- Systems available
- 8
What we see on Merritt slabs
For a Merritt or Nicola Valley project, include building heat, power availability, vehicle access and the proposed work dates. The slab and ambient conditions must meet the selected product requirements throughout installation and curing; confirm the window before booking a shutdown.
Systems we install in Merritt
Garage Floor Coatings
Attached and detached residential garages
$8-$12/sq ft · 2 days
Metallic Epoxy Floors
Showrooms, retail and salon floors
$12-$18/sq ft · 3 days
Flake Epoxy Systems
Garages, shops and mechanical rooms
$8-$12/sq ft · 2 days
Polyaspartic Coatings
Homeowners who cannot lose the garage for three days
$10-$15/sq ft · 1 day
Polished Concrete
Retail, restaurants and commercial interiors
$6-$14/sq ft · 3-5 days
Commercial & Industrial Epoxy
Warehouses, distribution and manufacturing
$6-$14/sq ft · 2-5 days
Quartz Broadcast Systems
Commercial kitchens and food processing
$11-$16/sq ft · 3-4 days
Concrete Repair & Surface Prep
Slabs being prepped for any coating or polish
$2-$6/sq ft · 1-2 days
Neighbourhoods we work in
Merritt. FAQ
Does Apex Concrete Coating Ltd. serve Merritt?
Yes. Apex is based in Kelowna and works throughout Merritt and the wider Nicola Valley, about 1 hour 45 minutes from Kelowna. Confirm site-visit availability, travel and the written scope for your location.
How much does an epoxy garage floor cost in Merritt?
A full-flake epoxy system with polyaspartic topcoat runs $8-$12 per square foot in Merritt, so a standard 2-car garage of about 500 sq ft is $4,000-$6,000. These are indicative planning figures. Preparation, access, travel and the selected system affect the written quote.
How long does a coating job take in Merritt?
Two days for a standard flake garage floor, one day for a full polyaspartic build, and three to five days for metallic, quartz or polished concrete. For commercial work in Merritt, discuss overnight, weekend or phased access. The selected products and site conditions determine when each area can reopen.
What documentation should I request before work starts?
Ask for the insurance, licensing and workplace coverage documents relevant to your project, along with the written scope and any product-specific warranty terms. Confirm these before booking.